In feasibility studies for energy storage projects, returns are built on a set of assumptions: peak-to-valley price spreads, annual cycle counts, capacity leasing prices, and ancillary service compensation. These assumptions stem from policies and market mechanisms, not from parameters that can be freely set in financial models. A single incorrect assumption can cause the IRR to vary by several percentage points.
1. Break down revenue into verifiable components
Time-of-use arbitrage depends on local time-of-use electricity pricing and charge-discharge efficiency; capacity leasing depends on the availability of stable lessees and lease duration; ancillary services depend on market rules and dispatch frequency. Since these three revenue streams have distinct risk profiles, they should not be combined into a single "blended unit price."
2. Assuming a sensitivity analysis is to be conducted
Perform range analysis on at least four variables: price spread, cycle count, efficiency decay, and rental price. Provide three scenarios—Base, Conservative, and Optimistic—and specify the trigger conditions for each. Single-point forecasts lack decision-making value.
3. Cost side is often underestimated
Battery capacity degradation leads to replacement costs, O&M labor, fire and safety management, and land or roof rental fees—often oversimplified in early projections. A mismatch between depreciation periods and actual battery lifespan can cause sudden profit pressure later on.
IV. Unified Decision Criteria
Investment decisions, budgeting, and performance evaluations must rely on the same set of assumptions. When three separate models tell different stories, it represents the most common management gap in such projects.
The economics of energy storage ultimately depend on the mechanism, not the equipment. Getting the mechanism right is what makes the financial model meaningful.